Work to protect the banks of Ravine Sèche at Ferme Leblanc, in the commune of Torbeck in the South department, is nearly finished, a World Bank and Agriculture Ministry delegation found during a field visit on Tuesday, November 3, iciHaiti reported.
Of the 750 meters of riverbank protection planned, 730.6 meters are already built, about 97.4%. For the gabions, the wire cages of stone that hold the banks, 6,974.4 cubic meters of a planned 8,935.1 have been completed, close to 78%. The works aim to reduce erosion, stabilize the banks and shield nearby farmland from runoff and heavy rain.
Agriculture Minister Marcelin Aubourg called Ferme Leblanc one of the country's important farming areas and praised farmers for continuing to produce despite the environmental pressures. He asked residents to set up a committee to look after the works and to prevent sand mining, which could weaken them.
Valens Mwumvaneza, the World Bank project officer, praised the quality of the work and the involvement of local people, especially women, who contributed technical skills. The visit was part of the bank's support mission for the PARSA resilient agriculture project and the TPR II productive territories project in the Grand Sud.
Comments
No comments yet. Start the conversation.