Agriculture Minister Marcelin Aubourg launched work on Friday, November 20, to build and rehabilitate the Périgny and Charlette irrigation systems in Torbeck, in Haiti's South department, HaitiLibre reported.
The works are part of the Irrigation Support Project in the South (PAIS), a 15-month initiative meant to improve access to water for more than 500 hectares of farmland. Aubourg said he was keeping a promise made when he headed the ministry's South directorate, and linked the project to the fight against drought and food insecurity.
On the Torbeck River, the first lot includes a new 50-metre reinforced-concrete weir with an 11-metre dissipation basin, a scouring gate, an intake with two gated openings and a 60-metre desilting channel, along with retaining walls and gabion bank protection.
The second lot rebuilds the Périgny network: 150 metres of the canal's end section, renovated stretches of the main canal, lined upstream sections, lateral intakes, crossings, public washing areas and watering troughs for livestock, according to PAIS coordinator Jean Matus Lucien.









Comments
No comments yet. Start the conversation.